New Build Roofing | Huntington
before
after
| Location: | Huntington Rd | Huntington | York | |
| Materials Used: |
|
|
| Skills required: | Traditional tiling. Traditional leadwork. Joinery to facility our leadwork. Electrical work to install the heat trace tape. Lime mortar pointing |
|
| Project Duration: | 4 Weeks | |
| Project Description: | We don’t often carry out new build work, as it is not as specialised or skilled an area of roofing, but B.D.S. chose us to carry out the work to the new Spar and veterinary buildings in Huntington. This sort of work is simply laying tiles, which isn’t overly taxing for our men. The lead work and dry ridge system are the only other elements of note on this project |
Tags:
GNR Roofing / Lead working / New Build Roofing / New Roof York / New Tiles / Roofers / York Roofing / Yorkshire
