Roofing Health & Safety
Risk Assessments & Method Statements

We plan roofing work around the risks presented by the building, access arrangements, materials, working methods and surrounding environment. Our project-specific RAMS set out how those risks are identified, controlled and communicated before work begins.

Explore the RAMS Library

01

Identify

Understand the building, the task, the access, the people affected and the hazards before work begins.

02

Control

Plan appropriate controls, sequencing, protection, supervision and emergency arrangements around the actual project.

03

Review

Keep the arrangements under review as the project progresses and amend them where the work or site conditions change.

PLANNED BEFORE WORK STARTS

Project-specific safety planning

No two roofing projects present exactly the same combination of risks. Height, access, temporary works, building condition, materials, occupants, public interfaces and weather can all alter how a project should be approached.

Our Risk Assessments and Method Statements are developed around the particular operations required for each project and reviewed where the scope, sequencing or site conditions change.

View Our Accreditations

RISK ASSESSMENTS & METHOD STATEMENTS

What are RAMS?

RAMS combine an assessment of the hazards associated with a task with a clear method for carrying out the work in a controlled manner.

For roofing projects, this can include work at height, scaffolding, temporary roofs, stripping, slating and tiling, leadwork, hot works, lifting operations, manual handling, structural repairs, heritage constraints and interaction with occupants or the public.

The project RAMS then bring the relevant controls together with site-specific information such as access arrangements, first-aid provision, emergency routes, fire procedures and project sequencing.

NEAL ROOFING TECHNICAL LIBRARY

Roofing RAMS Library

Our technical library sets out the principal risks, controls and working methods associated with common roofing activities. These pages support our project-specific RAMS and provide clients, designers and project teams with a clearer understanding of how individual operations are planned.

RAMS 01

Working at Height

Access, edge protection, roof work, fall prevention and supervision.

View Guidance

RAMS 02

Access Scaffolding

Designed access, loading, edge protection, inspections and scaffold controls.

View Guidance

RAMS 03

Temporary Roofs

Weather protection, temporary works, loading, wind and access arrangements.

View Guidance

RAMS 04

Leadwork & Hot Works

Lead sheet installation, lead burning, fire prevention and post-work fire watch.

View Guidance

RAMS 05

Slating & Tiling

Stripping, preparation, material handling, fixing and roof covering operations.

View Guidance

RAMS 06

Heritage Roofing

Working around historic fabric, retained materials and conservation-sensitive construction.

View Guidance

RAMS 07

Manual Handling

Handling slate, tile, lead, timber and other roofing materials safely.

View Guidance

RAMS 08

Lifting Operations

Mechanical handling, telehandlers, cranes, loading and controlled lifting zones.

View Guidance

RAMS 09

Roof Stripping

Controlled removal of existing coverings, debris management and exposed roof structures.

View Guidance

FROM LIBRARY TO LIVE PROJECT

Project-specific RAMS

The technical library provides the underlying control framework. Each live project then receives its own RAMS, combining the applicable working methods with the actual site conditions and project arrangements.

This allows the client, project team and operatives to work from one clearly defined project document rather than a generic set of safety statements.

Typical project-specific information includes:
site access • first aid • fire arrangements • hospital routes • temporary works • sequencing • project hazards • emergency procedures • operative briefing
View Our Projects

ACCESS & TEMPORARY WORKS

Scaffolding and controlled access

Access arrangements are planned around the building and work activity. Where independent scaffolding, loading bays, temporary roofs, lifting operations or other temporary works are required, these are coordinated with competent specialist providers and incorporated into the project safety arrangements.

Access Scaffolding RAMS

CLIENT GUIDANCE

Planning construction work properly

Construction (Design and Management) Regulations 2015

Construction work requires appropriate planning, coordination and management. The project arrangements should reflect the nature of the work, the risks involved and the parties carrying out or affected by those works.

Our project documentation is intended to communicate how the roofing operations will be undertaken and how significant risks will be managed throughout the work.

Client Health & Safety Guidance

Construction Phase Planning

For applicable projects, the Construction Phase Plan sits alongside the RAMS and defines the wider site management arrangements, responsibilities, welfare, coordination and emergency procedures for the construction phase.

Construction Phase Planning

PROJECT CONTROL

Clear information throughout the project

Our project pages are increasingly used to bring together specifications, programmes, site information, project updates and health and safety documentation in one controlled location.

This helps ensure that the client and project team can identify the current information relevant to the work being undertaken.

01 / Survey
Understand the building and project.
02 / Specify
Define the works and methodology.
03 / Assess
Identify risks and controls.
04 / Deliver
Brief, review and record.

DOCUMENTS

Policies & site information

Our core policies and site information documents support the project-specific controls set out within individual RAMS.

Health & Safety Policy | English Health & Safety Policy | Polish Site Rules | English Site Rules | Polish

NEAL ROOFING

Planned. Controlled. Documented.

Good roofing work depends on more than the finished roof. It requires the work to be properly surveyed, planned, communicated and controlled from the outset.

Arrange a Site Inspection