BS 8000-6:2023 Explained

Plain-English guidance on workmanship for slating and tiling—how materials should be handled, roofs prepared, underlays and battens installed, and tiles and slates laid correctly on site.

Book a site inspection
Roofing Regulations / British Standards

What is BS 8000-6:2023?

BS 8000-6:2023 is the British Standard code of practice for workmanship when slating and tiling roofs and walls. It provides practical site guidance covering material checks, storage, roof preparation, underlays, battens, tiles, slates, ridges, hips, valleys, verges, accessories and safe working.

It is intended to be read alongside BS 5534, project specifications and manufacturers’ installation requirements. BS 5534 mainly addresses design and fixing principles, while BS 8000-6 focuses on how the roofing work should actually be carried out on site.

Note: This page is an educational summary for clients. We are not reproducing the standard. Project-specific specifications and manufacturers’ instructions should always be followed.

View all standards

Jump to a section

Use the buttons below to skip to the part that matters to you.

Who it applies to Key ideas (plain English) Materials & storage Roof preparation Underlays & battens Tiles & mechanical fixing Ridges, hips & verges Slates & heritage roofs Client checklist FAQs Book an inspection

1) Who does BS 8000-6 apply to?

  • New roofs being covered with clay tiles, concrete tiles, natural slates or fibre-cement slates.
  • Re-roofing and refurbishment work on domestic and commercial buildings.
  • Vertically tiled or slated walls, including associated battens, counterbattens and accessories.

What it’s not: BS 8000-6 is not primarily a structural design standard. It is a workmanship standard explaining how specified roofing materials and systems should be checked, prepared, laid, fixed and finished on site.

2) The big idea in plain English

A well-designed roof can still fail if it is poorly installed. BS 8000-6’s core message is:

  • Good workmanship starts before laying begins. Materials, drawings, working instructions and the roof structure should be checked first.
  • The roof should be properly set out. Batten gauge, coursing, overhangs and junctions need planning before tiles or slates are fixed.
  • Every layer matters. Underlays, battens, fixings, flashings and accessories all contribute to performance.
  • Details require care. Eaves, ridges, hips, verges, valleys, abutments and penetrations are common defect locations.

If you remember one thing: roof quality depends as much on preparation and workmanship as it does on the materials selected.

NFRC Roofers

Why clients should care

  • Fewer slipped or damaged tiles
  • Better weather resistance
  • Straighter, cleaner roof finishes
  • Reduced repair and call-back costs

3) Materials, checking & storage

BS 8000-6 requires roofing materials to be checked before installation and stored so they remain suitable for use.

  • Check products: tiles, slates, battens, underlays and fittings should match the project specification and be undamaged.
  • Check identification: products should carry the appropriate manufacturer labelling, certification or conformity information.
  • Store safely: materials should be kept on firm, clean ground and protected from damage, contamination and traffic.
  • Protect timber: battens and counterbattens should be supported to prevent sagging, twisting and saturation.

Materials stored on the roof should be distributed carefully to avoid overloading or unbalancing the structure.

Client takeaway: damaged, unmarked or poorly stored materials should not simply be installed because they have already arrived on site.

4) Preparing the roof before work starts

Before roofing work begins, the installer should check that the structure and adjoining construction are ready.

  • Rafters and trusses: should be sound, securely braced and reasonably true.
  • Roof pitch and alignment: should suit the selected tile or slate and the required headlap and sidelap.
  • Fascias and gutters: should be correctly positioned to form the eaves datum and receive rainwater.
  • Flashings and valleys: concealed elements should be positioned before they are covered by slating or tiling.

The work should also be coordinated with other trades so that flashings, penetrations, insulation and fire-stopping are completed in the correct sequence.

Client takeaway: roofing should not start over a defective or poorly aligned structure in the hope that the roof covering will hide the problem.

5) Underlays, battens & setting out

Underlays and battens form the supporting system beneath the visible roof covering and require careful installation.

What this means in practice

  • Underlay direction: underlay is normally laid parallel to the eaves with the correct overlaps for the roof pitch and construction.
  • Drainage: unsupported underlay should be draped so water drains beneath battens and into the gutter.
  • Avoid damage: punctures and tears should be repaired before the roof covering is installed.
  • Batten quality: battens should be the specified size, correctly marked and fixed to every support.

Battens should be set out in straight, regular courses, with joints centred on supports and staggered appropriately.

Client takeaway: irregular batten gauge or poorly positioned underlay laps can affect both the appearance and weather performance of the finished roof.

A simple way to picture it

Underlay = the secondary weather layer
Battens = the setting-out and fixing base
Tiles or slates = the primary weather covering
Fixings = the restraint holding the system together

BS 8000-6 explains how these parts should be assembled on site so the completed roof matches the intended design.

6) Tiles & mechanical fixing

Clay and concrete tiles should be laid in regular courses and mechanically fixed in accordance with the design, BS 5534 and the manufacturer’s recommendations.

  • Set out before laying: roof width, verge overhangs and available tile shunt should be assessed in advance.
  • Do not exceed gauge: the manufacturer’s maximum batten gauge should not be exceeded.
  • Mechanical fixing: every tile should be mechanically fixed as a minimum, subject to the appropriate fixing specification.
  • Perimeter restraint: perimeter tiles should receive enhanced fixing because edges are more exposed to wind uplift.

Small cut tile pieces at hips, valleys and abutments should be securely fixed or bonded to adjacent full tiles using suitable proprietary methods.

Client takeaway: mortar or adhesive should not be used as a substitute for the required mechanical fixing of the roof covering.

7) Eaves, ridges, hips, verges & valleys

The most vulnerable parts of a tiled or slated roof are usually its edges and junctions.

  • Eaves: tiles or slates should project correctly into the gutter and remain in the same plane as the main roof.
  • Ridges and hips: should have the correct cover, bedding where used, and mechanical restraint.
  • Verges: overhangs, undercloaks, mortar or dry-fix components should be neatly aligned and securely fixed.
  • Valleys: underlays, valley linings and adjacent roof coverings should be installed to permit unrestricted drainage.

Dry-fix ridge, hip and verge systems should be installed in accordance with the relevant product requirements and manufacturers’ instructions.

Client takeaway: poor workmanship at one junction can compromise an otherwise well-laid roof.

8) Natural slates, fibre-cement slates & heritage roofs

BS 8000-6 includes separate workmanship guidance for natural slate and fibre-cement slate roofing.

  • Sort and prepare: natural slates should be checked, graded and prepared before laying.
  • Maintain headlap: batten gauge and slate size should provide the specified minimum headlap.
  • Fix carefully: nail holes, hooks and mechanical fixings should suit the slate type and roof exposure.
  • Traditional roofs: historic and reclaimed materials may require a conservation-led approach rather than standard modern detailing.

Client takeaway: natural slating is a skilled trade. Sorting, gauging, fixing and detailing all affect both appearance and long-term durability.

Heritage roofing services
NFRC Roofers

Client checklist: what “good” looks like

  • Materials checked against the specification before they are installed.
  • Roof structure inspected for line, level, pitch and readiness.
  • Underlay and battens installed correctly with appropriate laps, gauge and fixing.
  • Tiles and slates mechanically fixed in accordance with the design and manufacturer guidance.
  • Junctions completed neatly at eaves, ridges, hips, verges, valleys and abutments.

FAQs

BS 5534 mainly covers the design and specification of slated and tiled roof systems, including wind uplift and fixing requirements. BS 8000-6 focuses on workmanship and how the specified system should be prepared and installed on site.

The standard refers to the fixing requirements of BS 5534 and states that, as a minimum, every tile should be mechanically fixed. Additional fixings may be required at perimeter zones, steep pitches and exposed locations.

Unmarked battens do not demonstrate conformity with the required batten standard and may be unsuitable for the span, loading or fixing requirements. Correctly graded and marked battens should be used.

It can provide useful guidance, but some recommendations might not be appropriate where traditional or reclaimed materials are being retained. Listed and historic roofs may require specialist conservation advice.

Book an inspection Contact GNR Roofing

Back to top

Slating

Natural and fibre-cement slates prepared, gauged and fixed to recognised workmanship standards.

Tiling

Clay and concrete tiles set out, laid and mechanically fixed using good site practice.

Roof Inspections

Assessing workmanship, fixing, setting out and vulnerable roof junctions.