Location: Harrogate, North Yorkshire
Materials Used: VM Quartz Zinc,
Project Duration 3 weeks
Project Description: GNR were appointed to install a standing seam zinc roof covering on this new build extension. The roof was designed with a continuous central gutter and internal outlets so that no fall pipes were visible on the external face of the building. An overflow weir and outlet was concealed at one end of the extension so that should the main internal outlet block the water will be directed away from the building. The vertical fascias and soffits also in zinc provides a very contemporary appearance.